GRENADA DEPOT OFFICIALLY OPENED

It was a perfect weather day in Wellington on 8th April, as we officially opened our Grenada North transport depot with a ribbon-cutting ceremony and Operations Manager, John Vailalo, doing the honours.

Fully operational, at 3000sqm, the building is 6x times the size of the previous depot, plus has storage facilities for both chilled and ambient products. Strategically positioned off SH1, the site is well placed to service the greater Wellington region and better meet our customers' specific requirements.

Other features of the new site includes:

  • Fully enclosed loading platform

  • 4 dock levellers with additional loading docks

  • Dedicated open plan office space with Quiet rooms

  • Driver room

  • New lithium-ion forklift equipment

  • Facilities for our linehaul drivers having to overnight in Wellington

This will serve us well and gives us the platform we need to expand our presence in the region and underpins our growth strategy as we continue to invest in our depots, fleet, and people.

Halls Group Ltd